We recruit across EV charging in New York, and this is not one market. Curbside charging in the city, corridor fast charging upstate run by a state authority, depot and fleet, and heavy vehicle are four different businesses with different money behind them and almost no movement of people between them.
The thing that changed this year is that the incentive which paid for installation has closed to new applications. What has not changed is that the busiest curbside network in the country is in New York and it is running close to capacity.
Clients we have helped
The niches inside the niche
EV charging is not one market
Public charging, depot charging, the software platforms and the hardware manufacturers all hire differently, and people rarely move between them. Whichever one you sit in, the hiring problem next door is not your hiring problem.
- Public charging and CPOs
- You are hiring grid connection, siting and field service across an estate that is dispersed by design, and so is everyone you are bidding against for the same people.
- Bus, truck and depot charging
- If you build the charging, the people who genuinely understand megawatt charging sit with a handful of specialist providers, and you already know who they are. If you run the fleet, the expertise you need is one line inside a generalist operations role, so it has no job title to advertise against.
- eMSPs, roaming and charging software
- You are hiring like a software business, not an energy one, which means you lose people to fintech on salary before you reach offer. The one thing you cannot hire generically is roaming and protocol interoperability.
- Charge point manufacturers
- Design is not usually where it hurts. Certification, compliance and the units already in the field are, and the gap that keeps reappearing is embedded firmware and after-sales engineering.
- Home and domestic installation
- You are not competing with other charging businesses for electricians, you are competing with solar and heat pumps for the same qualified trades, and the qualification itself is becoming the constraint rather than the experience.
- Fleet and workplace charging
- Almost never its own job title, so when you need it you are hiring out of consultancies and specialist installers rather than from a business that looks like yours. The buyer sits in fleet or facilities rather than energy, which changes who the hire has to convince.
Our Approach
How we work here
Recruitment fundamentals travel. Markets do not. New York is a market where the loud signals mislead and the quiet ones matter. The utility that everybody assumes is the bottleneck does not advertise a single charging role, while advertising for storage interconnection openly. We check the employers at source rather than reading the funding announcements, because in this market the two point in different directions.
Before you brief anyone
Two questions worth answering first
Hiring from outside the sector means persuading somebody to change industry, and that turns on two things most businesses have never written down.
Why should a good engineer come into EV charging rather than any other part of the transition? And why should they come to you rather than the operator down the road?
Most cannot answer either, because most are offering the same things: a growing market, a good team, interesting work. None of that is a reason to move.
A business that hires on skills alone, without knowing whether the person actually cares about the transition, is usually hiring for the same role again sooner than it planned.
Why Hiring Here Is Different
Why hiring here is different from anywhere else
The constraint here is quiet, and that is what makes it dangerous.
Talent Scarcity
Where the pressure is right now
Site economics and development without the subsidy. The scarcest capability in New York right now, because most people who have built here have never done it without make-ready money behind them. Anyone who can underwrite a site on utilisation and pricing alone is doing a job that has only existed in this market since April.
Curbside and dense urban deployment. Different from every other kind of charging: it is a permitting, streetscape and community relations job as much as an electrical one, and the network with the highest utilisation in the country is about to grow eightfold. Very few people have delivered charging in a New York streetscape.
Utility liaison, which has no charging job title here. The utilities hire openly for storage interconnection and not at all for charging, so the capability exists inside general programme and engineering roles. Finding it means reading what people have actually done rather than what their title says.
Heavy vehicle and corridor delivery. The Thruway concession has made truck charging a contractual obligation to 2054 across five facilities, and the state authority network upstate is still building toward its target. That is committed work with a customer, unlike most of the fleet market here.
Anything that has run past seven weeks. A straightforward New York charging hire closes in four to six. Past that the brief is usually the problem rather than the market, and in New York the most common problem is a brief written for a subsidised project economics that no longer exists.
Based on live vacancy activity across the New York charging market. Reviewed 15 September 2026, updated monthly.
Market Intelligence
The market right now
-
April 2026
The money that paid for installation has closedFollowing a Public Service Commission order in March 2026, all five of New York’s joint utilities stopped taking new applications to the statewide EV make-ready incentive programme during April. Con Edison stopped accepting Level 2 applications and paused fast charging applications on 22 April. The programme may reopen for fast charging only. The utilities do not expect to reopen it for Level 2. This was budget exhaustion on schedule rather than an emergency, and the effect on a project’s economics is the same either way.
Source: EV Make-Ready Program .
-
4 August 2026
The busiest curbside network in America is here, and it is tinyNew York City has 88 curbside charge points. They are occupied by a vehicle more than 70% of the time, in some cases close to 99%, and delivering energy more than 85% of the time they are occupied, which the city states is the highest utilisation of any public curbside network in the country. Four of the five busiest sit in areas with high concentrations of licensed for-hire drivers. The city is now adding 600 more over three years.
Source: Expansion of curbside electric vehicle charging across five boroughs .
-
13 May 2026
The state removed its own forcing functionNew York’s zero emission school bus mandate, which required new purchases to be electric from 2027 and a fully electric fleet by 2035, was delayed five years in the May 2026 state budget to 2032 and 2040. Districts and operators cited cost and a lack of charging infrastructure. This was the largest dated heavy vehicle charging build-out in the state and its urgency has been removed by statute.
-
23 June 2026
The bus fleet is short of buses, not powerThe transit authority needs roughly 490 new buses a year to hold its replacement cycle. It received 161 in 2025 and is on pace for 370 in 2026, with two orders on hold. Reporting attributes the delay to electric bus manufacturer reliability rather than to utility interconnection, even though distribution upgrade work continues at several depots. The largest fleet electrification programme in the state is currently vehicle-constrained.
Source: Bus electrification delayed amid manufacturer challenges .
-
24 April 2026
Truck charging just became a condition of the concessionThe Thruway Authority issued a request for proposals in April 2026 to modernise 27 service areas under a contract running to 2054, and for the first time it requires bidders to include charging infrastructure for medium and heavy duty zero emission vehicles at five facilities, spaced no more than 200 miles apart. That turns heavy vehicle charging from a grant-funded programme into a contractual obligation on whoever wins the food and fuel concession.
Source: Request for proposals to modernise Thruway fuelling facilities , The state authority fast charging network upstate .
Market intelligence reviewed 15 September 2026.
TalentPilot
We would rather you needed us less
Most agencies are built so that you call them again. The model only works while hiring stays hard for you, which means nobody selling it has much reason to make it easier.
We took the opposite bet, and not only out of principle. A business that hires well on its own stays a client for years and brings us the roles that are genuinely difficult. A business that depends on an agency resents every invoice and leaves the first time somebody undercuts us. The second kind of relationship is worth less and lasts less long.
So we built TalentPilot. Twenty-one tools across planning, attracting, hiring and keeping people: map the roles before they become urgent, see where the people actually are, write the advert properly, run a consistent interview, and know which of your new starters is at risk before they resign.
And one thing almost nobody has. Every week, the real reasons candidates said no. Not a summary. The actual objections: the money, the location, the counter-offer, the part of the role that put them off. Most businesses never find out, which is why they keep making the same hire the same way.
Everything on this page is one market on one date. Our clients see their own, continuously.
What is left for us is the work that genuinely needs a search. That is the part we are good at, and the part worth paying for.
See how TalentPilot worksHow a search runs
You see it as we see it
- Before we start
- The brief and the target companies are agreed in writing. You know which businesses we are approaching and which we are not, before anyone is contacted.
- Every week
- The outreach, the response levels, where each person sits in the process, and the reasons anyone said no. The money, the location, the counter-offer, the part of the role that put them off.
- When it stalls
- You hear it from us. A search that has gone quiet is a conversation about the brief, not a report we delay until you ask.
What happens when you get in touch
A first call is a conversation about your hiring plan. Half an hour, with the consultant who runs this market for us.
We will tell you what we are seeing in your part of it: where the difficulty sits, which roles are moving and what people are actually being paid. You get that whether you decide to work with us or not.
If there is something we can help with, we will say what it would take and roughly how long. If there isn't, we will say so and point you at whoever is better placed.
No slide deck, no pitch, and nobody will chase you afterwards.
If you work in this market
What we are seeing from the other side
The same searches, read from the candidate side.
- Site development and commercial people
- If you have made a charging site work on its own economics rather than on an incentive, that is now the most valuable thing on your CV in this state, and it has been for about five months. Say it plainly.
- Curbside and urban deployment specialists
- A very small group. The city network is going from 88 points to nearly 700 and the permitting, streetscape and community side of it cannot be learned from a manual. If you have done it here you are close to irreplaceable.
- People inside utility clean energy programmes
- The electric mobility function exists inside the utilities even though it is not advertised. If you sit in one, the operators would take you tomorrow and mostly do not know you are there, because they are searching for titles rather than for what you do.
- Where it leads
- Site development into regional and portfolio leadership, curbside into programme management, and anyone who understands both the utility side and the commercial side into general management. That combination is rare here.
Questions
Clear answers for the next step.
What EV charging roles do you recruit for in New York?
Site development and acquisition, permitting, utility liaison, construction and project management, commissioning and field service, curbside and urban deployment, depot and fleet charging, network operations, and commercial leadership. The city and upstate are separate markets and we work both.
What happened to the make-ready incentive?
It closed to new applications across all five joint utilities during April 2026, following a Public Service Commission order in March. It was a scheduled budget exhaustion rather than an emergency. Fast charging applications may reopen; Level 2 is not expected to. The practical effect is that new projects now have to stand up on their own economics.
Is the grid the constraint in New York?
Less than people assume. The utilities advertise openly for storage interconnection and not at all for charging, and the largest fleet electrification programme in the state is currently short of buses rather than short of power. The binding constraints here are project economics and, in the city, street-level deployment.
Where is demand strongest?
Curbside charging in the city, by a distance. Eighty-eight points are running at more than 70% occupancy, in some cases close to 99%, which the city says is the highest utilisation of any public curbside network in the country, and the busiest sit where licensed for-hire drivers live. The network is going to nearly 700 points.
Is there committed heavy vehicle charging work?
Yes, and it is contractual rather than grant-funded. The Thruway Authority now requires medium and heavy duty charging at five service areas as part of a concession running to 2054. That is a different quality of commitment from a mandate that can be delayed, as the school bus deadline was in May.